Chaos Corona Forum
General Category => Gallery => Topic started by: Mouhamad Asswad on 2018-07-22, 22:13:16
-
The full view is here....
Main view on Behance : https://goo.gl/HvS3Zi (https://goo.gl/HvS3Zi)
Details and close-up : https://goo.gl/wmXRYB (https://goo.gl/wmXRYB)
-
Jaw dropping....
-
Phenomenal set. Would love to know more about timescales and workflow.
Did you use MD and z-brush at all?
-
Thanks ..
i used only 3ds max2016 =D, but about time....
it's personal project at all and i don't have a lot of time to complete this scene in short period, it's take around 8 months from design to rendering.
every image is a long story and render time is from the hell with 44 core / 88 threads it was between 20H to 70H for each image.
the time to open file it's another story =D with 20GB and Full geometry and non proxy and 128G.B of RAM.
-
Wow! Super interesting to know. You must have some patience....
How come you chose not to proxy things?
-
when you have 128GB of RAM or more is not important to use proxy.
Don't waste your time in thinghs you don't need with a hardware that can withstand the full geometry.