Chaos Corona Forum
Chaos Corona for 3ds Max => [Max] I need help! => Topic started by: whitelizard on 2018-01-17, 18:12:13
-
Hello there, maybe someone knows about this.
I set up the DR as it should, and it works on static images. The problem with animation is that the host, on EACH FRAME sends the scene to the nodes, and this in my case takes 1:20 of 2:00 minutes. Am I doing something wrong or should it be? On the idea, he should throw off scene and not leave it to count.
crown 1.6.3. sorry for english.
-
For animation, you could use Backburner - this sends the scene once to all nodes, and then each node will work on a different frame (vs DR where all machines work on the same frame).
-
Yes, probably have to learn backburner or do the video in parts. Just recently corona updated the DR manager and I somehow thought that this would not be a problem. Maybe developers do this in the future? It would be logical not to resend 500 times one scene back and forth.